Captain Dagim 3B+G+17 – Shoring Design
Geotechnical · Shoring design · Addis Ababa, Ethiopia
Support of excavation for the three-basement Captain Dagim tower. The 11.5 m excavation is retained by anchored bored piles (Ø600 at 1.6 m centres, 14 m long) combined with Ø20 soil nails where the ground and boundary conditions allow, keeping the system economical while protecting adjoining property. Design by Maereg D. Abegaz.
Key facts
- Building
- 3B+G+17
- Formation level
- −11.50 m
- System
- anchored bored piles with soil nails
- Piles
- Ø600 @ 1.6 m, 14 m long
- Soil nails
- Ø20
AZAD services on this project
- Geotechnical Engineering & Shoring Design – Anchored bored piles with soil nails, 11.5 m excavation
View this project in the interactive portfolio →
More mixed use projects by AZAD
Addis Life Mixed-Use TowerMixed use · Signal Square, Addis AbabaCabana Mixed-Use BuildingMixed use · Addis AbabaRising Star PLCMixed use · Addis AbabaOmar Mixed-use BuildingMixed use · Addis AbabaDAT TowerMixed use · Bole, in front of Tele MedhanialemEjegayew Dibaba Mixed-useMixed use · Bole, near Edna Mall