DIR Building 2B+G+15 – Shoring Design
Geotechnical · Shoring design · Addis Ababa, Ethiopia
Support of excavation for the 2B+G+15 DIR building. Along the rear boundary, where neighbouring structures sit close to the cut, AZAD specified contiguous cantilever bored piles (Ø800 at 1.10 m, 13.4 m long). The remaining faces use soldier piles (Ø600 at 1.80 m, 11 m long) restrained by a single row of ground anchors at −2.50 m. The staged excavation was analysed in DeepEX (FS 2.30). Design by Maereg D. Abegaz.
Key facts
- Building
- 2B+G+15
- Excavation
- 8.5 m deep
- Rear wall
- contiguous cantilever piles Ø800 @ 1.10 m, 13.4 m long
- Front and sides
- anchored soldier piles Ø600 @ 1.80 m, 11 m long
- Anchors
- one level at −2.50 m
- Stability
- FS 2.30 (DeepEX)
- Client
- DIR Building Merchants
AZAD services on this project
- Geotechnical Engineering & Shoring Design – Contiguous and anchored pile shoring, 8.5 m excavation
View this project in the interactive portfolio →