Minaye Gallery Office Building – Shoring Design
Geotechnical · Shoring design · Kazanchis, Addis Ababa, Ethiopia
Support of excavation for the Minaye Gallery Office Building in Kazanchis. AZAD designed a soil-nailed retaining wall for the 10 m basement excavation: six rows of 12 m GEWI Ø25 nails installed at 10° on a 1.5 m grid, with a 200 mm reinforced shotcrete face built top-down as the dig advances. Global stability was checked in GEO5 for every excavation stage (FS 1.99 at formation level). Design by Maereg D. Abegaz, approved by Dr. Trufat Hailemariam.
Key facts
- Excavation
- 10.0 m deep
- System
- Soil-nailed wall with shotcrete facing
- Nails
- GEWI Ø25, 12 m long at 10°, 1.5 × 1.5 m grid, six rows
- Facing
- 200 mm shotcrete
- Global stability
- FS 1.99 (GEO5)
AZAD services on this project
- Geotechnical Engineering & Shoring Design – Soil-nailed shoring design, 10 m excavation