The best time to save money on a building is before the first drawing. Owners who can answer these five questions get better designs, clearer fee offers and fewer changes once construction starts.
1. What do you want to build, and why?
Write a short brief: who will use the building, how many rooms or units you need, what each space is for, and what may change in ten years. A family that plans to add a floor later, or rent out the ground floor, needs a different structure from day one. Collect a few photos of spaces you like, and note why you like them.
2. What is your total budget, and what does it include?
Construction is only part of the cost. A realistic budget also covers design and engineering fees, permits, soil investigation, supervision, finishes, furniture and a contingency for the unexpected. Tell your architect the real number. Designing to an unknown budget is the most common cause of redesign.
3. Is your plot ready?
- Title deed map (ካርታ) and, if leasehold, the lease contract
- The plan agreement, showing what the city plan allows on the plot
- A boundary or topographic survey
- A soil investigation, or a plan to commission one
Without these, the architect is designing on assumptions. See our building permit checklist for what the permit office will ask for.
4. What do you need the architect to do?
"Design" can mean very different scopes. Decide which you need:
- Concept design only
- Permit drawings
- Full working drawings and specifications
- Structural, electrical and sanitary engineering
- Site supervision during construction
- Interior design
If you want one contract from design to handover, consider a design-build firm, which designs and builds under one agreement.
5. How will you choose?
- Check registration. Architects and engineers in Ethiopia must be registered with the federal construction regulator. Ask to see the certificate, and check that it covers your building's category.
- Look at similar work. Ask for projects of a similar type and size, and visit one if you can.
- Meet the team. Find out who will actually work on your project day to day.
- Compare like with like. Compare offers on the same scope and deliverables, not on the fee alone.
- Put it in writing. Agree the scope, deliverables, schedule, fee and payment stages in a signed contract.
Frequently asked questions
What documents should I have before meeting an architect?
Your title deed map, lease contract if leasehold, the plan agreement, a site survey and, ideally, a soil investigation, plus a short written brief and your total budget.
Do architects need a licence in Ethiopia?
Yes. Architects and engineers must be registered with the federal construction regulator, and their registration should cover the category of building you plan.
What is design-build?
A delivery method where one firm designs and builds the project under a single contract, so the owner has one point of responsibility from design to handover.